Pavingexpert - Tarmacadam, Bitmac and Asphalt ...

Construction Method Mark out the site. It is assumed that the surfacing is to be flush i.e. level, with the existing ground. It is a good idea to excavate wider than the planned width, allowing an extra 300-450mm at the edges makes handling much easier, especially if kerbs are to be used.